Stormdry spray treatment – Telscombe

CASE STUDY STORMDRY SPRAY TREATMENT Telscome Manor – Telscombe Telscombe Manor is a Grade II listed house located in the small picturesque village of Telscombe, in the Lewes district of East Sussex. The manor of Telscombe was granted in the late 11th century, by King Edgar. Parts of the building itself are thought to date…

Refurbishment damp proofing

CASE STUDY REFURBISHMENT DAMP PROOFING St Mary’s Hall – Brighton Newton Damp Proofing Membranes Designed To Damp Proof Grade II Listed Private School in Brighton Project Details St Mary’s Hall in Brighton is a prestigious private school which required multiple damp proofing treatments as part of its refurbishment. Miller Bourne Architects, in conjunction with Newton’s…

Waterproofing to New Build Basement, Weybridge

CASE STUDY Basement Waterproofing St Georges Hill, Weybridge Project Details This substantial new build property was being constructed with a full earth retaining basement area under the main house. Our design requirements were to protect the basement of this valuable property with a waterproofing system that would meet with BS8102:2009 requirements and provide a long…

Waterproofing to New Build Basement

CASE STUDY Basement Waterproofing New House, Fairwarp, East Sussex Project Details This new-build property, sited within the lovely Ashdown Forest in Fairwarp, was being constructed with a full earth retaining basement area under the main house.  Our design requirements were to ensure that the waterproofing aspect met with BS8102:2009 requirements and provided a long-term maintainable…

Waterproofing to New Build Guest Lodges

CASE STUDY Basement Waterproofing The Lodges, Ticehurst Project Details The hotel were looking to increase their capacity for guests in an innovative way. 4 lodges were designed to be constructed with the majority of the walls being earth retaining and requiring waterproofing sufficient to give luxurious accommodation for overnight or longer, so a grade 3…